Free E_S4HCON2023 Exam Braindumps
SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Exam Questions 31–35 (page: 8)

Updated On: 9-Feb-2026

During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?

There are 3 correct answers to this question.

  1. Execution of SPAU modification adjustment
  2. Execution of eCATTs for business validation tests
  3. Creation of the table structures in the new SAP HANA database
  4. Execution of SPDD modification adjustment
  5. Execution of XPRAs and AIMs

Answer(s): A,B,E



When using the DMO of SUM, which files can be handled by SUM in the download directory?

There are 2 correct answers to this question.

  1. Parameter file SAPup_add.par
  2. Stack XML file calculated by the Maintenance Planner
  3. Breakpoint configuration file SAPUPPHAS.BRK
  4. MIGRATE J5T_DUR_XML file from a previous run

Answer(s): B,D



You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".

Where can you change this during the migration via the Utilities option of the SUM UI?

There are 2 correct answers to this question

  1. In SUM Phaselist
  2. In Process Control Center
  3. In SUM Parameters
  4. In DMO Migration Preparation

Answer(s): B,C



During the SUM procedure, the phase XPRAS_AIMMRG fails.
Where can you most likely see the reason for the error?

There are 2 correct answers to this question.

  1. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
  2. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
  3. In the job log for the corresponding job in SM37 (Job Overview)
  4. In the corresponding R3trans log files of this phase

Answer(s): B,C



You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.

Following SAP recommendations, how will you achieve this?

There are 2 correct answers to this question.

  1. Specify the business functions that need to be switched on during the prepare part of SUM.
  2. Import a transport request from the development system that contains the recording of the activation.
  3. Activate the required business functions manually in the production system.
  4. During conversion, SUM delivers some business functions already activated.

Answer(s): B,D



Viewing page 8 of 17
Viewing questions 36 - 40 out of 80 questions


Post your Comments and Discuss SAP E_S4HCON2023 exam prep with other Community members:

AI Tutor AI Tutor 👋 I’m here to help!