The statistical difference between a process operating at a 5 sigma level and a process operating at a 6 sigma level is markedly different when it comes to the number of defects present.

  1. True
  2. False

Answer(s): A



A Six Sigma level is calculated by which of the following equations:

  1. (Opportunities - Defects)/Opportunities x 100
  2. (Opportunities + Defects)/Opportunities x 100
  3. (Defects - Opportunities)/Defects x 100
  4. (Defects + Opportunities)/Defects x 100

Answer(s): A



When prioritizing Six Sigma projects within an organization:

  1. The project with the statistically lowest sigma level should always be prioritized
  2. The project with the highest potential cost savings should always be prioritized.
  3. The project with the highest potential customer satisfaction increase should always be prioritized.
  4. All of the above should be considered and statistically researched before choosing the best option for the organization at hand.

Answer(s): D



What does the Value Stream mean?

  1. is the sequence of all items, events and people required to produce an end result.
  2. is used to identify areas of concern, waste and improvement.
  3. Neither A nor B
  4. Both A and B

Answer(s): D