If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?

  1. Individual-Moving Range
  2. Xbar-R Charts
  3. Xbar-S Charts
  4. nP and P Charts

Answer(s): B



After a Belt has put data through the smoothing process which chart would be used to look for trends in the data?

  1. Moving Average Chart
  2. Multi-Vari Chart
  3. X bar Chart
  4. Pareto Chart

Answer(s): A



The ability to repeat the same measurement obtained with one measurement instrument used several times by one appraiser while measuring the identical characteristic on the same part is known as ____________.

  1. Repeatability
  2. Bias
  3. Linearity
  4. Reproducibility

Answer(s): A



A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?

  1. Never, a Control Plan is a living document
  2. As soon as the Champion signs off
  3. Within 30 days of the LSS project review team meeting
  4. After the project has been presented at the recognition event

Answer(s): A



The deviation of the measured value from the actual value is known as _____________.

  1. Bias
  2. Linearity
  3. Repeatability
  4. Movement

Answer(s): A



Viewing page 6 of 41
Viewing questions 26 - 30 out of 200 questions