UiPath UiADPv1 Exam
UiPath Automation Developer Professional v1.0 (Page 13 )

Updated On: 1-Feb-2026

What advantages do pre-built connectors in UiPath Integration Service offer?

  1. Reducing the need for Ul and API automation, allowing developers to work exclusively with connectors.
  2. Providing a fully customizable catalog of connectors for developing proprietary applications.
  3. Replacing all types of authorization and authentication protocols with a single, standardized method.
  4. Simplified integration with popular applications, faster deployment, and integration across all UiPath Platform product solutions.

Answer(s): D



Which expression correctly converts the string variable “DateString” with the value “03/03/2023 16:23:11” into a Date Time variable?

  1. DateTime.ParseExact(DateString, “mm/dd/yyyy HH:mm:ss”, CultureInfo.InvariantCultue}
  2. DateTime.ParseExact(DateString, “dd/MM/yyyy HH:mm:ss”, CultureInfo.InvariantCulture}
  3. DateTime.ParseExact(DateString, “dd/MM/yyyy hh:mm:ss”, CultureInfo.InvariantCulture}
  4. DateTime.ParseExact(DateString, “MM/dd/yyyy hh:mm:ss”, CultureInfo.InvariantCultue}

Answer(s): B



What distinguishes the Settings sheet from the Assets sheet in the “Config.xisx’ file?

  1. Settings sheet contains Credential Assets stored in Orchestrator. Assets sheet contains hard-coded values.
  2. Settings sheet contains only values used for the initialization of applications. Assets sheet contains only Credential Assets stored in Orchestrator
  3. Settings sheet contains hard-coded values. Assets sheet contains all names of Orchestrator Assets except those of type Credential
  4. Settings sheet contains hard-coded values. Assets sheet contains all names of Orchestrator Assets including those of type Credential

Answer(s): C



A developer defines new log fields using the Add Log Fields activity. When will the custom log fields stop being added to the robot execution logs?

  1. When an Exception is caught and handled.
  2. When a Remove Log Fields activity is used to remove them.
  3. When a Log Message activity is executed with Log Level = Warm or higher.
  4. When the first Log Message activity is executed.

Answer(s): B



In a UiPath project that uses State Machines, under what circumstances should the Final State activity be used in the project?

  1. When initiating the first state of a state machine.
  2. When marking the successful completion or termination of a state machine’s execution.
  3. When an intermediary state has multiple possible transitions.
  4. When a particular state contains complex conditional logic.

Answer(s): B



Viewing page 13 of 32
Viewing questions 61 - 65 out of 268 questions



Post your Comments and Discuss UiPath UiADPv1 exam prep with other Community members:

Join the UiADPv1 Discussion