What should be ensured before uploading items to test data queues?

  1. All the items in the queue are set as consumed.
  2. The creation of a test data queue with a corresponding JSON schema.
  3. The administrator permissions for Orchestrator is obtained.
  4. The test data queue was uploaded to the server.

Answer(s): B

Explanation:

Before uploading items to test data queues, it is essential to ensure that the test data queue is created with a corresponding JSON schema. This schema defines the structure of the data to be uploaded, ensuring that the items are correctly formatted and compatible with the test case execution.



Objects of which data source for the data variation can be found inside Studio in the Project tab, under Entities?

  1. Test Data Queue
  2. Data Service
  3. File
  4. Auto Generate

Answer(s): B

Explanation:

In UiPath Studio, Data Service objects for data variations can be found inside the Project tab, under Entities. This allows you to define and manage structured data within the project for data-driven testing.



What conclusions can be drawn from the exhibit?
Test uplorer , a
0






0


1








►


►


►




  1. It's a data-driven test case with 2 variations, 2 variations were run and 2 not yet run.
  2. It's a data-driven test case with 3 variations, 3 variations were run and 3 not yet run.
  3. It's a data-driven test case with 6 variations, 3 variations were run and 3 not yet run.
  4. It's an automated test case with 8 variations.

Answer(s): C

Explanation:

The Test Explorer shows a data-driven test case named "Create Loan" with 6 variations under TestCaseValues. Out of these, 3 have green flask icons (indicating they were run and passed), while 3 have blue play icons (indicating they have not yet been executed).



Where can the variations that have passed or failed for a data-driven test case in UiPath Studio be viewed?

  1. On the parent test cases in the Test Results panel.
  2. On the individual test case data variations in the Test Results panel.
  3. In the Test Manager configuration.
  4. In the Assertions tab of the corresponding test case result.

Answer(s): B

Explanation:

In UiPath Studio, the Test Results panel displays the outcome of individual data variations for a data-driven test case. This allows users to see exactly which data inputs passed or failed during execution.



Having the test case described in the image below:


The test data queue was imported in Studio workflow through a variable called testQueue. The structure of the Test Data Queue can be seen below:


What ROI will be printed in the Output panel when the test case from the Text Explorer panel is run?

  1. 67,77
  2. 12,45
  3. 45
  4. 67,34,77

Answer(s): C

Explanation:

The logic in the test case checks whether FiscalYear Mod 2 = 0 (i.e., even years). If true, it logs the corresponding ROI. Only FiscalYear 2022 is even and not marked as consumed, so it will be used.
2020 is even but already consumed.
2022 is even and not consumed → ROI 45 is logged.



Viewing page 11 of 23