What are the three phases within the Integrative Process Credit, Integrative Process?

  1. Pre-design, Discovery, Design and Construction
  2. Discovery, Design and Construction, Operations and Feedback
  3. Schematic Design, Design and Construction, Operations and Feedback
  4. Design Charrette, Schematic Design, Operations and Feedback

Answer(s): B

Explanation:

The Integrative Process credit under the LEED BD+C v4 rating system encourages the coordination of all the project team members, starting from the predesign phase, to discover unique opportunities for project design, enhanced building performance, and green features. The three phases within the

Integrative Process Credit are:
Discovery phase: This involves investigating at least two energy-related and several water-related sustainable design strategies prior to the end of schematic design. Design and Construction (implementation) phase: This requires the project teams to turn their findings into reality.
Occupance, Operations, and Performance Feedback phase: This phase involves the evaluation of the implemented strategies and their effectiveness.


Reference:

LEED Integrative Process Credit Explained - Projectific, Inc. LEED AP BD+C v4 - Integrative Process Flashcards | Quizlet Achieving the LEED v4 Integrative Process Credit - SketchUp



What percentage of a building's surface area may be excluded from the calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 2. Renovation of Abandoned or Blighted Buildings because of deterioration or damage when maintaining existing building structure, enclosure and interior structural elements?

  1. 5%
  2. 10%
  3. 25%
  4. 50%

Answer(s): C

Explanation:

For the Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 2. Renovation of Abandoned or Blighted Buildings, up to 25% of the building surface area may be excluded from the credit calculation due to deterioration or damage.


Reference:

LEED Certification- Requirements for Material & Resource Credit: Building Life-Cycle Impact Reduction - Firstgreen Consulting Pvt Ltd



When preparing the Sustainable Sites Prerequisite, Construction Activity Pollution Prevention, the Construction General Permit must contain which of the following?

  1. Waste Management Plan
  2. Building orientation on the site
  3. Installation plan for perimeter control
  4. Minimum standards for equipment exhaust

Answer(s): C

Explanation:

The Construction General Permit (CGP) for the Sustainable Sites Prerequisite, Construction Activity Pollution Prevention, must contain an installation plan for perimeter control. This is part of the Erosion and Sedimentation Control (ESC) Plan, which is designed to prevent loss of soil during construction by stormwater runoff and/or wind erosion, prevent sedimentation of storm sewer or receiving streams, and prevent polluting the air with dust and particulate matter.


Reference:

Sustainable Sites Prerequisites | GlobalSpec



A LEED AP is evaluating whether Indoor Environmental Quality Credit, Acoustic Performance is feasible for a LEED
AP Building Design and Construction: Healthcare project.
Which of the following groups of documents would best inform this decision?

  1. Airport flyover maps, mechanical plans, wall sections
  2. Patient records, wall sections, ceiling panel cut sheets
  3. Occupancy statistics, patient records, MRI machine specifications
  4. MRI machine specifications, mechanical plans, occupancy statistics

Answer(s): A

Explanation:

The Acoustic Performance credit under the LEED BD+C: Healthcare rating system addresses the acoustic environment in healthcare spaces. It requires strategies that reduce noise levels, control background noise, and provide sound privacy. The documents that would best inform this decision are:

Airport flyover maps: These can help determine the level of external noise intrusion into the building, which can affect the acoustic environment.
Mechanical plans: These can provide information about the location and type of mechanical equipment, which can be a source of internal noise.
Wall sections: These can provide information about the construction of the walls, including materials and assemblies, which can affect sound transmission between spaces.


Reference:

Acoustic performance | U.S. Green Building Council



Page 32 of 78



Post your Comments and Discuss US Green Building Council LEED-AP-BD-C exam with other Community members:

Mikronet commented on December 12, 2024
good pratice lessons
UNITED STATES
upvote

blaze commented on December 12, 2024
is the PDF worth it? Are these questions the same on the exam?
Anonymous
upvote

Mike Kutenda Chizinga commented on December 12, 2024
are these questions still valid
Anonymous
upvote

sas commented on December 12, 2024
good but not flexible
Anonymous
upvote

Anonymous commented on December 12, 2024
Very helpful and reference link also has been given.
Anonymous
upvote

Anonymous commented on December 12, 2024
Preparing or certification
Anonymous
upvote

Sai commented on December 12, 2024
Preparing for the exam
AUSTRALIA
upvote

Ankita commented on December 12, 2024
dumps are good and helpful
UNITED STATES
upvote

yajnas commented on December 12, 2024
lot of the questions are from AZ-400 practice test
JAPAN
upvote

yajnas commented on December 12, 2024
very relevant information
JAPAN
upvote

yajnas commented on December 12, 2024
good material
JAPAN
upvote

AEB commented on December 11, 2024
The breadth of knowledge for this exam is large. It doesn't seem possible to learn everything on it for an associate level exam.
UNITED STATES
upvote

rvg commented on December 11, 2024
A great source of preparation for this exam
INDIA
upvote

the coder1 commented on December 11, 2024
It helped alot
UNITED KINGDOM
upvote

N commented on December 11, 2024
This is so good. I will literally ace the test.
Anonymous
upvote

BU WIN SIO commented on December 11, 2024
GOOD VERY HELP FUL
UNITED STATES
upvote

Pss wd commented on December 11, 2024
preparing for exam
Anonymous
upvote

Anonymous commented on December 11, 2024
really good
INDIA
upvote

Anonymous commented on December 10, 2024
Good questions for revision
UNITED STATES
upvote

Milik commented on December 10, 2024
Very resourceful information
Anonymous
upvote

Milik commented on December 10, 2024
Great info Marion to succeed on your test……….
Anonymous
upvote

Ritesh commented on December 10, 2024
Good content
Anonymous
upvote

Mikil commented on December 10, 2024
I will tell others about this study site
Anonymous
upvote

Milik commented on December 10, 2024
Good resource for your studies. I will refer to my frirnds
Anonymous
upvote

Mikil commented on December 10, 2024
I will tell others about this site.
Anonymous
upvote

Mikil commented on December 10, 2024
I will tell others of this site
Anonymous
upvote

Mikil commented on December 10, 2024
Great research for my test
Anonymous
upvote

Mikil commented on December 10, 2024
Great resource. I would tell others
Anonymous
upvote

Mikil commented on December 10, 2024
Great resource
Anonymous
upvote

Michelle commented on December 10, 2024
Great resource
Anonymous
upvote

ArulMani commented on December 10, 2024
It's very useful study for EMT exam
UNITED STATES
upvote

no name commented on December 10, 2024
helpful to recap the course
Anonymous
upvote

none commented on December 10, 2024
very helpful to recall the course
Anonymous
upvote

Sandeep Singh commented on December 10, 2024
All questions are from real exam.
UNITED STATES
upvote