When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following information is required to be present in the Owner's Project Requirements
(OPR)?

  1. All applicable codes and standards
  2. Interior finishes related to the project
  3. All project team members and applicable roles
  4. Energy efficiency goals and training requirements

Answer(s): D

Explanation:

Energy efficiency goals and training requirements are required to be present in the Owner's Project Requirements (OPR) when applying the Integrative Process to a Building Design and Construction project. According to the LEED v4 BD+C Reference Guide, the OPR is a document that details the ideas, concepts, and criteria that are determined by the owner to be important to the success of the project 1. The OPR must include, among other things, the following information related to energy efficiency 1:
The owner's energy performance goals and expectations
The owner's requirements for energy metering and monitoring The owner's requirements for energy modeling and analysis The owner's requirements for commissioning and verification The owner's requirements for training and documentation The other options are not required to be present in the OPR, as they are either related to other aspects of the project, such as codes and standards, interior finishes, or project team members, or they are not relevant to the Integrative Process, which focuses on early analysis of energy, water, and site systems 2.


Reference:

LEED v4 BD+C Reference Guide, Integrative Process Category, IPc Integrative Process, page 632.



Plug-in task lighting will be utilized in a LEED project at all workstations. The task lighting is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance since

  1. it is being covered by Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control
  2. it is specifically exempted by ASHRAE
  3. it will be installed by the owner
  4. the lamp wattage has not been determined

Answer(s): C

Explanation:

Plug-in task lighting is considered as furniture and is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance. It is also not required to comply with the lighting control requirements of ASHRAE 90.1-2010. However, it can be used to satisfy the individual control requirement of Indoor Environmental Quality Credit, Interior Lighting, Option 1.


Reference:

LEED v4 for Building Design and Construction, p. 361
LEED v4 for Building Design and Construction, p. 6012
ASHRAE 90.1-2010, Section 9.1.13



Which of the following project types is required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations?

  1. Retail
  2. Schools
  3. Healthcare
  4. Core and Shell

Answer(s): C

Explanation:

Healthcare projects are required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations. This is because healthcare projects have different daylighting needs and challenges than other project types, and the perimeter area is more likely to have access to natural light and views. The perimeter floor area is defined as the regularly occupied spaces within 15 feet (4.5 meters) of the exterior wall that meets the minimum glazing requirements.


Reference:

LEED v4 for Building Design and Construction, p. 6021
LEED v4 for Building Design and Construction, p. 362



What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

  1. One
  2. Two
  3. Four
  4. Six

Answer(s): C

Explanation:

According to the LEED Reference Guide for Building Design and Construction1, the Integrative
Process Prerequisite, Integrative Project Planning and Design, requires the project to assemble an integrated project team that includes at least four key project team members, in addition to the owner or owner's representative. The key project team members are those who have the authority and responsibility to make design decisions and implement them during construction. The integrated project team should include professionals from different disciplines, such as architecture, engineering, landscape, interior design, construction, commissioning, operations, and maintenance. The integrated project team should collaborate throughout the project phases, from discovery to occupancy, to achieve the project goals and optimize the building performance.


Reference:

LEED Reference Guide for Building Design and Construction v4 Integrated Product Team (IPT) - AcqNotes
The Power of an Integrated Project Team Process - Little






Post your Comments and Discuss US Green Building Council LEED-AP-BD-C exam with other Community members:

LEED-AP-BD-C Exam Discussions & Posts