An owner has expressed concerns to the LEED AP about the costs associated with the integrative process. How can the LEED AP relieve the owner's concerns?

  1. The LEED AP should explain to the owner that since the integrative process is not a prerequisite, it can be dropped from the project thus cutting back project costs
  2. The LEED AP should explain that while the first costs and the design fees will be higher due to the integrative process, the operational savings will make up for the extra costs
  3. The LEED AP should explain that the integrative process can easily be postponed and reconsidered until after the design for the construction phase, when it will most likely save costs for the project
  4. The LEED AP should explain that the integrative process reduces costs by avoiding delays associated with design changes during the construction document phase and reducing change orders during construction

Answer(s): D

Explanation:

The integrative process is a strategy that can lead to both immediate and long-term cost savings. By engaging in early analysis of the interrelationships among systems, the project team can identify unique opportunities and challenges. This early engagement helps to optimize the design, which can reduce the time and cost associated with making design changes later in the project and minimize the need for change orders during construction.


Reference:

Understanding Integrative Design in LEEDv4 - BuildingGreen. LEED v4 for Interior Design and Construction (ID+C): Reference Guide. New LEED Integrative Process Credit Encourages Design-Build.



To satisfy the Increased Ventilation strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, the breathing zone rates of outdoor air ventilation to all occupied spaces must be increased above the minimum rates required in ASHRAE 62.1-2010 by at least what percentage?

  1. 10%
  2. 20%
  3. 30%
  4. 50%

Answer(s): C

Explanation:

To meet the Increased Ventilation strategy under the Enhanced Indoor Air Quality Strategies credit, the breathing zone outdoor air ventilation rates must be increased by at least 30% above the minimum rates required by ASHRAE 62.1-2010. This increase is intended to improve indoor air quality and promote a healthier indoor environment.


Reference:

The LEED v4 reference guide for Interior Design and Construction includes this requirement as part of the strategies to enhance indoor air quality.



Which of the following phases should be included in the Integrative Process Credit, Integrative Process in order to comply with the intent of this credit?

  1. Discovery; design and construction; occupancy; operations and feedback
  2. Discovery and design; construction and occupancy; post occupancy and operations
  3. Pre-design and design; construction and occupancy; post occupancy and operations
  4. Pre-design and design; construction and pre-occupancy; post occupancy and operations

Answer(s): A

Explanation:

The Integrative Process Credit under LEED AP Interior Design + Construction V4 emphasizes the importance of a holistic approach that includes various phases of a project. The correct phases that should be included to comply with the intent of this credit are Discovery, Design and Construction, Occupancy, Operations, and Feedback. This approach ensures that sustainable strategies are integrated from the earliest stages of the project and continue through to post-occupancy to maximize performance and sustainability.


Reference:

The LEED v4 Reference Guide for Interior Design and Construction provides detailed guidance on the Integrative Process Credit, highlighting the need for a comprehensive approach that spans the entire project timeline.



A tenant implements the following strategies to reduce the amount of water used.
Which strategy is applicable to the Water Efficiency Credit, Indoor Water Use Reduction for LEED Interior Design and Construction: Commercial Interiors?

  1. Composting toilet
  2. Low-flow irrigation system
  3. Commercial clothes washer
  4. Roof runoff for chiller make-up water

Answer(s): A

Explanation:

The composting toilet is applicable to the Water Efficiency Credit, Indoor Water Use Reduction for LEED Interior Design and Construction: Commercial Interiors because it significantly reduces the amount of water used for conventional flushing toilets. By composting human waste, this system eliminates the need for water in the disposal process, contributing to indoor water use reduction.


Reference:

The LEED v4 Reference Guide for Interior Design and Construction includes the composting toilet as a strategy for reducing water use within the indoor environment. The LEED v4 Indoor Water Use Reduction Calculator also provides a framework for calculating water savings, where the use of composting toilets can contribute to achieving the prerequisite and credit requirements for water use reduction.



Page 4 of 26



Post your Comments and Discuss US Green Building Council LEED-AP-ID-C exam with other Community members:

Amer commented on December 24, 2024
Thanks alot
EGYPT
upvote

shankar commented on December 24, 2024
good set of questions
CHINA
upvote

VARSHA commented on December 24, 2024
GOOD QUSTIOENS.. LIKED IT
Anonymous
upvote

Robin commented on December 24, 2024
nice course
Anonymous
upvote

Rama laksmana commented on December 23, 2024
Good question
UNITED STATES
upvote

Chandru commented on December 23, 2024
Nice questions
UNITED STATES
upvote

Amr commented on December 23, 2024
Good tutorial
Anonymous
upvote

hari commented on December 23, 2024
Preparing for exam
INDIA
upvote

Ichigo Kurosaki commented on December 23, 2024
Can I pass the exam, if I have done suppose 150 questions from here?
MALAYSIA
upvote

Emma commented on December 23, 2024
Really helpful for preparing the exam
FRANCE
upvote

Siva commented on December 23, 2024
Good ones with the quick start
INDIA
upvote

sj commented on December 22, 2024
good set of questions
Anonymous
upvote

sj commented on December 22, 2024
Questions that are typically not covered as part of the aws learning course videos
Anonymous
upvote

sowmya commented on December 22, 2024
helpfull to prepare for the exam
Anonymous
upvote

Leandro commented on December 22, 2024
very usefull
BRAZIL
upvote

vishal solanke commented on December 22, 2024
Please try to post explanations
Anonymous
upvote

Suchi Poddar commented on December 22, 2024
Good set and nice to see that so much help for the students. Thankyou so much.
Anonymous
upvote

Prashant commented on December 22, 2024
good practise
Anonymous
upvote

shree sri commented on December 22, 2024
great work for learning
UNITED STATES
upvote

M Ajaykumar commented on December 21, 2024
Literally helpful
Anonymous
upvote

Narasimha commented on December 21, 2024
it is helpful for ACE GCP Exsm
INDIA
upvote

shan commented on December 21, 2024
Nice questions
Anonymous
upvote

resha commented on December 21, 2024
Very nicely explained
Anonymous
upvote

Abhishek commented on December 21, 2024
It was Nice
Anonymous
upvote

Sumeet G Hongekar commented on December 21, 2024
I am eger to write cad exaam
UNITED STATES
upvote

KAREEM ROFIAT BOLANLE commented on December 21, 2024
not yet written the exam
Anonymous
upvote

Subham commented on December 21, 2024
Good set of question for practice
Anonymous
upvote

Krish commented on December 20, 2024
Good to have test papers
INDIA
upvote

Ashish Sharma commented on December 20, 2024
Very elaborative explanation and apt questions
CANADA
upvote

Ashish Sharma commented on December 20, 2024
Very Useful
CANADA
upvote

Ashwani commented on December 20, 2024
Nice questions
UNITED KINGDOM
upvote

hardik commented on December 20, 2024
Very good content
UNITED STATES
upvote

Test commented on December 20, 2024
its helpful
Anonymous
upvote

haardik commented on December 20, 2024
Good so far
UNITED STATES
upvote