Free LEED-Green-Associate Exam Braindumps

During the pre-design phase of a three-story office building, the project team determines that the anticipated energy use of the proposed building will exceed the Owner's Project Requirements (OPR).
What strategy should the project team consider in order to lower the building's energy use?

  1. Increase the square footage of the building
  2. Maximize daylighting opportunities with properly sized and oriented windows
  3. Use valid survey protocols to assess occupants' satisfaction with the indoor environment
  4. Monitor and verity performance to ensure that building systems are functioning as designed

Answer(s): B



In order to maintain the LEED Green Associate credential, you must earn which of the following continuing education credits?

  1. 15 hours per year with six hours being LEED specific
  2. 15 hours every two years with three hours being LEED specific
  3. 30 hours per year with three hours being LEED specific
  4. 30 hours every two years with six hours being LEED specific

Answer(s): B



The intent of waste management in the Materials and Resources credit category is to

  1. specify the use of green materials
  2. promote the use of rapidly renewable resources
  3. reduce the amount of waste and toxins hauled to landfills
  4. increase the use of pre-consumer/post-consumer recycled content

Answer(s): C



Strategically locating functional and decorative hardscape on a project site may reduce the amount of on-site

  1. waste area
  2. sensitive area
  3. pervious area
  4. impervious area

Answer(s): D






Post your Comments and Discuss US Green Building Council LEED-Green-Associate exam with other Community members:

LEED-Green-Associate Discussions & Posts