Which parameter in NetBackup Management > Host Properties must be modified to change the logging level to 5 for the NetBackup client named clientl.example.com?

  1. set the "Global logging level" in the master server host properties.
  2. set the "Global logging level" in the client host properties.
  3. enable "Logging for critical processes" in the master server host properties.
  4. enable "Logging for critical processes" in the client host properties.

Answer(s): A



Refer to the exhibit.


The following Storage Lifecycle Policy was used to back up data from a client. All duplication jobs have completed, and none of the backups have expired.
How should an administrator restore data from the tape using NetBackup?

  1. from the BAR console, select the tape backup to restore from.
  2. from the NetBackup Administration Console, promote copy 1 to the primary copy.
  3. from the NetBackup Administration Console, promote copy 2 to the primary copy.
  4. from the BAR console, start the restore and NetBackup will automatically select the tape copy.

Answer(s): C



An AdvancedDisk storage unit consistently reaches capacity, causing older, staged backups to expire. How can the administrator control the prioritization of images that get removed?

  1. change the priority for secondary storage lifecycle operations.
  2. use Data Classification.
  3. change the priority of relocation jobs in the staging schedule.
  4. modify Retention Levels.

Answer(s): B



An administrator has a backup for client Linux1 using the LinuxClients policy complete successfully. Even though the policy Backup Selections are NOT modified, the backup job fails the next day with the following status code:

Error 71: none of the files in the file list exist.

What is a possible reason the job failed?

  1. The ''Enable granular recovery" option was unset.
  2. The client was added to another backup policy.
  3. The file systems have been unmounted on the client.
  4. The client was temporarily shut down.

Answer(s): C



An administrator views the following errors from the Detailed Status tab of a failed job in the Activity Monitor.



Which command should the administrator perform to test the communication between the master server and the client based on the output?

  1. bptestbpcd
  2. bpclntcmd -self
  3. bptestnetconn -s
  4. nbdb_ping

Answer(s): C