Free 2V0-602PSE Exam Braindumps
vSphere 6.5 Foundations (PSE) Questions 96–100 (page: 21)

Updated On: 10-Feb-2026

What are two valid iSCSI discovery methods? (Choose two.)

  1. Assigned Discovery
  2. Automatic Discovery
  3. Static Discovery
  4. LUN Masking
  5. Dynamic Discovery

Answer(s): C,E


Reference:

https://docs.vmware.com/en/VMware-vSphere/6.5/com.vmware.vsphere.storage.doc/GUID- 66215AF3-2D81-4D1F-92D4-B9623FC1CB0E.html



A vCenter Server displays this error for a single host:
Virtual machine creation may fail because agent is unable to retrieve VM creation options from the host

Which action will allow a vSphere Administrator to resolve the issue?

  1. Log in to the vSphere Web Client, select the ESXi host and manually place it into Quarantine Mode.
  2. Log in to the vCenter Server Appliance Management UI and reboot the VCSA.
  3. Log in to the vSphere Web Client, select the cluster that the ESXi host belongs to and turn off DRS.
  4. Log in to the host DCUI, press F2 and navigate to Troubleshooting Options> Restart Management Agents.

Answer(s): D



Which option is true during a virtual machine cold migration?

  1. Data is transferred over the vMotion VMKernel interface.
  2. The datastore of the virtual machine cannot be changed.
  3. Migrating a virtual machine from an Intel-based host to a AMD-based host generates an error.
  4. Migrating a 64-bit virtual machine to a 32-bit host generates a warning.

Answer(s): D



A vSphere Administrator notices that one of the virtual machines has been configured for VMDirectPath I/O, and a physical NIC has been assigned to the VM.
What feature is not available to this VM?

  1. Storage DRS
  2. VMware Tools upgrades
  3. vMotion
  4. Virtual Machine Compatibility version upgrades

Answer(s): C



A VMware vSphere 6.x Administrator has been tasked with enabling the Integrated Load Balancer for the new vRealize Log Insight cluster.
What three options are required before the Integrated Load Balancer can be used? (Choose three.)

  1. The time on the vRealize Log Insight virtual appliance must be synchronized with an NTP server.
  2. All vRealize Log Insight nodes are configured as the same size.
  3. The vRealize Log Insight master and work nodes must have CA signed certificates.
  4. Verify that all vRealize Log Insight nodes and the specified Integrated Load Balancer IP address are on the same network.
  5. The vRealize Log Insight master and worker nodes must have the same certificates.

Answer(s): A,D,E



Viewing page 21 of 78
Viewing questions 101 - 105 out of 385 questions


Post your Comments and Discuss VMware 2V0-602PSE exam prep with other Community members:

AI Tutor AI Tutor 👋 I’m here to help!