Free 3V0-32.21 Exam Braindumps (page: 3)

Page 2 of 16

A company has recently completed an audit and has found that there are many virtual machines in their production environment which no longer appear to be in use. To prevent this from happening in future, the company is deploying vRealize Automation and would like all provisioned VMs to meet following requirements:

-VMs to have a default lease of 90 days and no more than 365 days Lease policy can be overridden on case by case basis
-Upon initial lease expiry, the VM should be kept for 10 days after which they will be destroyed

Which policy design will meet the technical requirements?

  1. Create a lease policy with the organization scope, setting 90 days lease, 365 total lease and grace period to 10 and a hard enforcement
  2. Create a lease policy with the organization scope, setting 90 days lease, 365 total lease and grace period to 10 and a soft enforcement
  3. Create a lease policy with the project scope, setting 90 days lease, 365 total lease and grace period to 10 and a soft enforcement
  4. Create a lease policy with the project scope, setting 90 days lease, 365 total lease and grace period to 10 and a hard enforcement

Answer(s): C



A cloud architect is writing an implementation plan for deployment of a clustered vRealize Automation deployment that will use a third-party load balancer. Which two steps should the architect include within the implementation plan to ensure a successful deployment of vRealize Automation? (Choose two.)

  1. Disable all secondary nodes from the load balancer pools
  2. Create and configure the monitoring of vRealize Automation and vRealize Orchestrator
  3. Ensure all the SAN certificates for vRealize Suite are available
  4. Enable all non-primary nodes on the load balancer
  5. Turn off the health monitors or change them temporarily to default to ICMP and ensure traffic is still forwarding to the primary node

Answer(s): B,C


Reference:

https://docs.vmware.com/en/VMware-Validated-Design/6.1/sddc-deployment-of-cloud-operations-andautomation-in-the-first-region/GUID-18A6AEF4-2EF7-47B2-B421-D34156344652.html



An architect is designing the deployment of vRealize Log Insight (vRLI) in their data center. The customer has the following requirements: vRLI cluster responds to multiple Virtual IP Addresses (VIPs) Each event message received from a VIP is associated with a tag Which two design decisions would the architect make to achieve the requirements? (Choose two.)

  1. Configure a CSV file to use with VIP tags.
  2. Configure a list of static tags (key=value) for an integrated load balancer VIP, so that each event message received from a VIP is annotated with a tag.
  3. Each node should have at least one network interface on the same subnet as that of a VIP.
  4. Configure a list of dynamic tags (key=value) for an integrated load balancer VIP, so that each event message received from a VIP is annotated with a tag.
  5. Each node should have at least one network interface on a different subnet as that of a VIP.

Answer(s): B,C


Reference:

https://docs.vmware.com/en/vRealize-Log-Insight/4.8/com.vmware.log-insight.administration.doc/GUID-7B981536-F80C-458F-A196-2AFD4B1D33C2.html



An architect is designing a new VMware vRealize Cloud Management solution. During the requirements gathering workshop, the customer made the following comments:
-The monthly uptime target of the cloud management solution must be 99.9%.
-All components of the cloud management solution must be deployed with a N + 1 redundancy.

When creating the design documentation, how should these requirements be classified?

  1. Recoverability
  2. Manageability
  3. Availability
  4. Performance

Answer(s): C






Post your Comments and Discuss VMware 3V0-32.21 exam with other Community members:

3V0-32.21 Discussions & Posts