VMware 3V0-42.20 Exam
Advanced Design VMware NSX-T Data Center (Page 5 )

Updated On: 1-Feb-2026

Which is a family of solutions for data center designs that span compute, storage, networking, and management, serving as a blueprint for a customer’s Software Defined Data Center (SDDC) implementations? (Choose the best answer.)

  1. VMware SDDC Design
  2. VMware Validated Design
  3. VMware POC Design
  4. VMware Cloud Foundation

Answer(s): B



A Solution Architect will be deploying an Ethernet Virtual Private Network (EVPN) in their NSX-T Data Center environment.

What two selections must be prepared for the EVPN deployment? (Choose two.)

  1. deployed Tier-0 gateway
  2. deployed Load Balancer
  3. deployed Tier-1 gateway
  4. remote gateway with support for IGP and VLAN priority
  5. remote gateway with support for MP-BGP and VXLAN

Answer(s): B,E


Reference:

https://docs.vmware.com/en/VMware-NSX-T-Data-Center/3.0/nsxt_30_admin.pdf



Which three choices are part of a Design Approach when discussing design alternatives and their effects? (Choose three.)

  1. backup
  2. budget
  3. cost
  4. performance
  5. knowledge
  6. security

Answer(s): D,E,F



An architect is helping an organization with the Logical Design of an NSX-T Data Center solution. This information was gathered during the assessment:
-There must be a performance based SLA for East – West traffic.

Which two key performance features should the architect recommend? (Choose two.)

  1. Configure N-VDS enhanced Data Path
  2. Install advanced Edge pNIC Features
  3. Setup RSS to leverage multiple cores
  4. Leverage DPDK drivers
  5. Enable GENEVE Offload

Answer(s): C,E



Which two VMware recommendations should an architect follow when configuring top of rack (ToR) switches in an NSX-T Data Center environment? (Choose two.)

  1. Use only IPv4 addressing in all deployments.
  2. Configure redundant physical switches to enhance availability.
  3. Configure switch ports that connect to ESXi host manually as trunk ports.
  4. Configure switch ports with a Dynamic Trunking Protocol.
  5. Modify the Spanning Tree Protocol to increase the time to transition to the forwarding state.

Answer(s): D,E


Reference:

https://docs.vmware.com/en/VMware-Validated-Design/5.0.1/vmware-validated-design-501-sddc-nsxt-workload-architecture-design.pdf (18)



Viewing page 5 of 13
Viewing questions 21 - 25 out of 57 questions



Post your Comments and Discuss VMware 3V0-42.20 exam prep with other Community members:

Join the 3V0-42.20 Discussion