DRAG DROPA company would like to utilize its current infrastructure but wants to adopt virtualization to consolidate its environment. Currently, the infrastructure contains:-Server with 2 x 8 cores CPUs and 98GB of memory -Backup LAN with a single physical switch -Production LAN -Sufficient datastore performance as determined by the storage team. Match the existing infrastructure component to its appropriate concept. Select and Place:Exhibit A:Exhibit B:
Answer(s): A
The system administrator team is planning to upgrade its vCenter Server 5.5 environments to version 6.5.-Each vCenter 5.5 is pointing to a Single Sign On (SSO) server that has a dedicated virtual machine-The SSO servers are currently in independent SSO domains.-During the upgrade process, the administrators would like to combine their two SSO domains into a single one.View the exhibit.Referring to the exhibit, which upgrade scenario would accomplish this?
Answer(s): B
An organization’s security policy requires a design where the ESXi hosts will be manageable only through vCenter Server.Which two security configurations will help meet this requirement? (Choose two.)
Answer(s): B,C
A company is in the process of deploying a modern video-streaming application.-The application is able to scale (expand and collapse) its streaming nodes in the form of CentOS 7.x 64bit virtual machines, based on demand.-This IO-Intensive application has a high CPU demand and generates a significant number of disk operations (IOPS).-To host the application, the company decided to implement a brand-new VMware cluster with vSphere 6.x. -The company would like a significant reduction in CPU utilization as well as possible increase in throughput.Which virtual disk adapter should be recommended for the company’s physical design?
http://virtuallyhyper.com/2012/09/vcap5-dcd-objective-3-5-determine-virtual-machine-configuration-for-a-vsphere-5-physical-design/
A solution architect has been tasked with designing a new environment for a company’s growing needs, and has obtained this information:-Uptime is critical during regular business hours when 95% of the transactions occur. Application uptime must be 99.9% during those hours.-In a true disaster, the business can withstand a day of data loss and half a day of downtime. -The company is one year into a 5-year contact with the co-lo data center.-The building that is currently occupied no longer has any floor space available, but the company has 3 empty racks of space. The co-lo can provide up to 11KVA of power per rack.-There are current contains with Dell to provide servers and with Cisco to provide the network components -The network team has standardized on an end-to-end 10Gb network.Based on this information, what are two requirements for the new design? (Choose two.)
Answer(s): A,C
Post your Comments and Discuss VMware 3V0-624 exam prep with other Community members:
Our website is free, but we have to fight against AI bots and content theft. We're sorry for the inconvenience caused by these security measures. You can access the rest of the 3V0-624 content, but please register or login to continue.