The CIO of a company has asked that a review of all user’s applications be undertaken to improve storage usage. After the review, it was found that a number of applications are used by several different organizations within the company. These applications are currently all installed in all of the different master images, making each of the master images very large.What VMware technology would improve storage usage?
Answer(s): C
A customer is deploying Horizon View 7.1 utilizing a Cloud Prod Architecture. The customer wants to utilize 32-node clusters, and a single vCenter at each site to support 9,500 desktops per site.Which two statements about this configuration are true? (Choose two.)
Answer(s): A,B
His request arises from the fact that a single instance of vCenter Server can support 10,000 virtual machines. With View 5.2 and later, customers have the ability to use a single vCenter Server to manage a 10,000-desktop environment.
https://docs.vmware.com/en/VMware-Horizon-7/7.1/com.vmware.horizon-view.planning.doc/GUID-CE4019FE-0C43-462A-A08E-82357B1CAF8B.html
A customer has chosen vRealize Operations Manager for Horizon as its monitoring solution. The customer’s requirements are: -Monitor the PCoIP metrics to address user experience complaints. -Minimum required resources should be used for monitoring purposes. Recent project updates include:-vRealize Operations Manager is already in use for vSphere monitoring.-All desktop templates are created with Horizon 7 View agent and Horizon deployment is at the final stage of completion.-Existing vRealize Operations Manager capacity is already scaled out to meet the current requirements of Horizon 7 monitoring needs.Which two additional components are required to make the monitoring systems ready? (Choose two.)
Answer(s): C,E
vRops agent is part of the horizon agent so no need to install the separate agents on the master image. The broker agent and adapter are required though.
A company is implementing VMware Horizon View 7 solution. It has created four 500 linked-clone desktop pools to be used by different departments and workers. The company’s VDI administrator noticed that Horizon View Composer is showing in error state on the View Admin Web Console.During restart of the Composer service, the service failed to start up again. A decision was made to migrate View Composer to a new server and preserve the linked-clone information.What three steps are requires for the migration? (Choose three.)
Answer(s): C,D,E
A company is deploying VDI and needs to meet these requirements: -Support a bring-your-own-device (BYOD) strategy-Support external contractors -Support access from anywhere-Reduce or eliminate costly desktop and laptop replacementWhich two solutions should an architect recommend? (Choose two.)
Answer(s): B,C
It says support BYOD, not Manage BYOD, so A is not needed.Since this is an older exam, Access Point Appliance name still applies (now called UAG) and you can leverage Horizon Clients on any device, any user from anywhere.Airwatch is just MDM soltuion. But they were deploying VDI. VDI need Horizon Clients. And they want to access anywhere. of course you can aceess in external without UAG(Access point). It need help network team like L4, etc.. But UAG can access in External without Network team.