A concrete slab measuring 10 feet wide by 13.5 feet long by 6 inches deep is to be installed. How many cubic yards of concrete will be required?
Answer(s): D
A systematic coding structure for organizing and managing scope, assets, cost, resources, work and schedule activity information is a______________.
Answer(s): B
Which of the following best describes the concept of total cost management:
AACE International defines _____________as a technique of economic evaluation that sums over a given study period, the costs of initial investment, replacements, operations, and maintenance/repair; expressed in either present or annual value terms.
Post your Comments and Discuss AACE International CCP exam with other Community members:
Marry Clear commented on September 18, 2020 Very easy purcahse process. The material is well formatted and the Xengine Exam Simualtero is very cool and intuative. I am happy with my purcahse CANADA upvote
Our website is free, but we have to fight against bots and content theft. We're sorry for the inconvenience caused by these security measures. You can access the rest of the CCP content, but please register or login to continue.