[Installation Procedures]
Which of the following steps are required to apply to thin-layer erosion-resistant linings? (This may have more than one correct answer; please select all answers that apply.)

  1. Water slicking of the lining surface is permitted
  2. Overfill will be removed until flush with the tops of the hexmetal
  3. Mix times will be determined during the material qualification testing
  4. The refractory will be fully compacted in and around the anchor supports

Answer(s): B,C,D



DRAG DROP
[Inspection and Testing Requirements]
Which factors must be the same when retesting a sample that fails to meet specification?

  1. See Explanation for the Answer.

Answer(s): A

Explanation:



[Material Requirements]
Which of the following does not apply to cold crushing strength (CCS)?

  1. Density of sample affects testing loading rate
  2. Testing shall be in accordance with ASTM C1113
  3. CCS shall be determined on samples that have been fired to 1500°F (815°C)
  4. The loading head of the testing machine shall have a spherical bearing block

Answer(s): B



[Installation Procedures]
When installing refractory castables in hot weather conditions, which of the following is acceptable? (This may have more than one correct answer; please select all that apply.)

  1. Air conditioning of ambient air
  2. Decreasing mixing time
  3. Shading of equipment and mix area
  4. Spraying water on equipment

Answer(s): A,C,D



[Material Requirements]
In the absence of owner specification, which party or individual sets the temperature limits for refractory and mix water?

  1. Contractor
  2. Manufacturer
  3. Inspector
  4. Independent refractory laboratory

Answer(s): B