Service parts needs are most often determined by:

  1. bills of material explosion.
  2. forecasts based on prior demand.
  3. material requirements planning (MRP) logic calculations.
  4. analysis of lead-time requirements.

Answer(s): B



A distributor provides customer service by improving which of the following market driven factors?

  1. Availability
  2. Design
  3. Shelf life
  4. Quality

Answer(s): A



When demand is uncertain, what is the most appropriate action to take?

  1. Recalculate safety stock
  2. Increase order quantity
  3. Change method of transportation
  4. Increase number of warehouses for distribution

Answer(s): A



A work center has 2 machines that are operated 16 hours a day for 5 days a week. Historically, the utilization has been 85% and the efficiency 105%. What is the rated capacity for this work center? (Rounded)

  1. 71
  2. 99
  3. 130
  4. 143

Answer(s): D



Which of the following is an input to capacity requirements planning (CRP)?

  1. Bills of material (BOM)
  2. Lot-sizing rules
  3. Open shop orders
  4. Standard cost

Answer(s): C