There are 14 different defects that can occur on a completed time card. The payroll department collects 328 cards and finds a total of 87 defects. DPMO =:
Answer(s): F
A random sample of 2500 printed brochures is found to have a total of three ink splotches. The rate of ink splotches in PPM is:
Answer(s): C
If DPU = 0.022, the RTU is approximately:
Answer(s): D
A project activity not on the critical path has required 20% longer than the time originally allocated. The project team should:
Post your Comments and Discuss ASQ CSSBB exam with other Community members: