Free ACP-100 Exam Braindumps (page: 9)

Page 8 of 19

You set up a new project for a team. Soon afterward, users report that a field is missing from one of their screens. You check the screen configuration in the administration panel and you see that the field should be present. Why can’t the users see the field?

  1. The changes to the screen were not published.
  2. The issue operation wasn’t mapped to a screen.
  3. The field context does not include the project and/or issue type.
  4. The users don’t have permission to view that field.

Answer(s): D



A dashboard displays an Issue Statistics gadget as shown.


The dashboard owner wants to change the order of the statuses shown in the gadget to appear as follows.

1. To Do
2. In Progress
3. Ready For QA
4. Blocked
5. Rejected
6. Done

Which action will permanently arrange the statuses into the required order?

  1. Reorder the statues on the Status administration page.
  2. Change the Sort Direction option in the gadget to Ascending.
  3. Change the category of the statuses.
  4. Add numbers to the status names to allow them to be sorted in numerical order.
  5. Change the gadget Sort By field to Total.

Answer(s): D


Reference:

https://community.atlassian.com/t5/Jira-questions/How-to-change-order-of-statuses-in-a-Two-Dimension-filter/qaq-p/320423



A team of technical writers works in the WRITE project. The project uses a single, shared workflow. To better match the team’s way of working they request a workflow change:
-The initial status of their project’s workflow should be changed from Open to Awaiting Inspiration.

You navigate to the Workflows section of the administration, update the Name of the status in the workflow designer and publish your change.

What are two implications of this change? (Choose two.)

  1. The workflow scheme for the WRITE project will need to be published before the change takes effect.
  2. Awaiting Inspiration will be created as a new Status in Jira.
  3. Transitions to the Awaiting Inspiration status will fail until the post functions for those transitions are updated.
  4. Filters and Gadgets that referred to the Open status by name will be broken.
  5. The Open Status will be changed to Awaiting Inspiration in all workflows using that status.

Answer(s): A,B



You are tidying up a Jira project and find that the following two issue types are being used.

-Task
-Assignment

They seem very similar. If both are not needed, you could convert all existing Assignment issues in the project into Task issues and remove the Assignment issue type from the project.

Which project configurations would you check to see if it is necessary to keep the two as separate issue types instead? (Choose three.)

  1. Issue Security Levels
  2. Field Configurations
  3. Components
  4. Permissions
  5. Workflows
  6. Field Contexts

Answer(s): A,B,F






Post your Comments and Discuss ATLASSIAN ACP-100 exam with other Community members:

ACP-100 Discussions & Posts