Free Avixa CTS Exam Questions (page: 5)

[Developing AV Solutions]
During an initial customer visit, it is important to determine whether or not one is

  1. going to get the job.
  2. being competitive enough.
  3. meeting with the decision maker.
  4. going to have enough cable in stock to do the job.

Answer(s): C



[Developing AV Solutions]
The contrast control sets the

  1. white balance of the Image.
  2. range for the hue of the image.
  3. color temperature of the image.
  4. range for the difference between white and black.

Answer(s): D



[Developing AV Solutions]
The circuit on the RIGHT is an electrical drawing of what type of speaker system?

  1. series circuit
  2. constant voltage
  3. stereo pair circuit
  4. combination parallel/series circuit

Answer(s): D



[Developing AV Solutions]
When planning to use audio equipment on a converged enterprise network, it may be desirable to separate broadcast domains in order to

  1. avoid audio feedback between devices.
  2. avoid crosstalk between multi track channel packets.
  3. avoid delaying time sensitive AV traffic on the network.
  4. comply with local electrical and telecommunication regulations.

Answer(s): C



[Operating AV Systems]
An application requires Its equipment to be operational 24 hours a day and the owner considers the system mission critical.
What type of warranty would be BEST for the equipment?

  1. limited warranty
  2. implied warranty
  3. manufacturer's factory warranty
  4. advanced replacement warranty

Answer(s): D



[Developing AV Solutions]
A client has ordered a large project from a company. This project has several critical components and a fixed schedule.
Which of the following will be VITAL for ensuring that the company meets the deadlines?

  1. proper job costing
  2. confirming lead times
  3. qualifying the customer
  4. confirming price changes

Answer(s): B



[Developing AV Solutions]
Before confirming an anticipated completion date with the customer, it is MOST important to

  1. double check the floor finishes.
  2. ensure the date is not a holiday.
  3. ensure no components are backordered.
  4. create the system maintenance schedule.

Answer(s): C



[Conducting a Needs Assessment]
Which of the following is addressed within the Needs Analysis part of the AV Design process?

  1. creating the project timeline
  2. outlining project Bill of Materials
  3. identifying key stakeholders for the project
  4. identifying functional requirements of the project

Answer(s): D



Viewing page 5 of 33
Viewing questions 33 - 40 out of 254 questions



Post your Comments and Discuss Avixa CTS exam prep with other Community members:

CTS Exam Discussions & Posts