Free Avixa CTS Exam Questions (page: 3)

[Designing AV Systems]
When connecting a condenser microphone, what MUST be included in die system design for it to operate?

  1. mixer
  2. stand
  3. transmitter
  4. power source

Answer(s): D



[Developing AV Solutions]
When creating an estimate for a request for proposal (RFP), what is the FIRST tiling that should be done?

  1. obtain the costs
  2. create the submittal
  3. schedule a site visit
  4. read the project description

Answer(s): D



[Developing AV Solutions]
Network Quality of Service (QoS) is defined as

  1. the ability to prioritize the traffic in the network system.
  2. the ability to set the quantity of stations connected via the network.
  3. the ability to remotely manage network switches, routers and hubs via the network connection.
  4. a feature allowing the network administrator to monitor who is connected to the network at any given time.

Answer(s): A



[Developing AV Solutions]
A saeen is 144 in (3658 mm) wide and the throw ratio is 2.3:1. How far from the screen should the projector be placed?

  1. 288 In (7303 mm)
  2. 302 in (7681 mm)
  3. 331 in (8413 mm)
  4. 446 in (11339 mm)

Answer(s): C



[Developing AV Solutions]

Which method of control is supported by HDBaseT?

  1. PCIE
  2. DAU
  3. RS-232
  4. DMX512

Answer(s): C



[Developing AV Solutions]
During project delivery and after completion, it is important to ensure correct management of control system code so that

  1. programming costs will be within project budget.
  2. other contractors are unable to reuse or edit code.
  3. the most up-to-date version of code is available for upload when required.
  4. sub-contract programmers submit uncompiled code as per their contract of employment.

Answer(s): C



[Developing AV Solutions]
Assuming a 10' (3 m) ceiling, what is the approximate volume of this room?

  1. 300 cubic ft (8.5 m3)
  2. 600 cubic ft (17 m3)
  3. 1500 cubic ft (42.5 m3) o
  4. 6000 cubic ft (162 m3)

Answer(s): D



[Developing AV Solutions]
The BEST way to ensure that a project is on budget is to

  1. calculate the number of calendars days remaining to completion.
  2. visit the job site and determine the percentage of work completed.
  3. ask the installation team to estimate remaining work to completion.
  4. review accrued labor and material costs against remaining work.

Answer(s): D



Viewing page 3 of 33
Viewing questions 17 - 24 out of 254 questions