Which project delivery method involves two separate contracts: one with the designer and one with the general contractor?

  1. design-build
  2. design-bid-build
  3. integrated project delivery
  4. construction management at risk

Answer(s): B



Allowances are included in contract documents when

  1. the project is design-build
  2. final product selection is unknown
  3. more competitive bidding is desired
  4. a proprietary specification is provided

Answer(s): B



What kind of schedule shows which tasks are the highest priority and what the effect will be on the overall project if the tasks take longer than estimated?

  1. Work Flow
  2. Gantt Chart
  3. Critical Path Method (CPM)
  4. Program Evaluation Review Technique (PERT)

Answer(s): C



During a high school renovation project, the school board and several teachers each call the designer several times a week to request changes.
What is the BEST way for the interior designer to keep the project on schedule?

  1. Send a weekly summary of calls, emails, and meetings to the stakeholders
  2. Ask the client to establish a point person and a clear line of internal decision-making
  3. Set up a weekly meeting with all stakeholders to discuss all of their proposed changes
  4. Talk to each stakeholder and take the time to incorporate all of the changes they request

Answer(s): B



If the net square footage [m²] is 50,000 square feet [4,645 m²] and usable square footage [m²] is 77,000 square feet [7,154 m²], what is the circulation factor?

  1. 20%
  2. 35%
  3. 25%
  4. 40%

Answer(s): B