Which NSX component communicates with the VTEP?
Answer(s): B
Identify the VTEP's role: The VTEP, or VXLAN Tunnel Endpoint, is responsible for encapsulating and de-encapsulating the network traffic sent over the VXLAN1. Understand NSX Components: The NSX Controller is a key component of the VMware NSX network virtualization platform. It is responsible for the control plane, managing the state of virtual networks and overlay transport zones.Communication with VTEP: The NSX Controller communicates with the VTEP to manage the overlay network and ensure that traffic is correctly routed and encapsulated across the network infrastructure.Role of other NSX Components: While the NSX Edge provides routing services and the NSX Manager is the centralized management component, it is the NSX Controller that directly manages the state of the virtual network and communicates with the VTEPs.
A customer is using Cisco UCS 6332-16UP 40-Port Fl. They have 16 ports dedicated for FC traffic. The customer needs to increase the number of FC ports.What is a consideration?
Answer(s): A
In the Cisco UCS 6332-16UP 40-Port Fabric Interconnect, unused server ports can be converted to FC (Fibre Channel) ports. This flexibility allows customers to reconfigure ports based on their specific needs, increasing the number of available FC ports when additional FC connectivity is required.
Cisco UCS Fabric Interconnect configuration guides.Cisco UCS 6300 Series Fabric Interconnect data sheets and documentation.
Based on the RCM Upgrade Process RACI, who is responsible and accountable for the pre-upgrade questionnaire used during the Initiation Phase?
Answer(s): D
In the RCM (Release Certification Matrix) Upgrade Process RACI (Responsible, Accountable, Consulted, Informed) matrix, the pre-upgrade questionnaire used during the Initiation Phase is typically the responsibility and accountability of the Project Manager and the Customer. The Project Manager ensures the completion of the questionnaire to gather necessary information for planning the upgrade, while the Customer provides the required data.
Dell EMC RCM documentation.Standard RACI matrix practices in project management.
A customer engineer is unable to securely connect to vCenter using their laptop. Both the vCenter and the customer laptop are behind a firewall. The network security team requests that the customer engineer provide source and destination port numbers to establish the needed connection.What ranges of source and destination port numbers are valid?
When securely connecting to vCenter, the customer engineer needs to provide the correct source and destination port numbers. The valid source port range for secure connections is typically from49152 to 65535, which are ephemeral ports assigned by the operating system for outbound connections. The destination port for secure connections to vCenter is 443, which is the standard port for HTTPS.
VMware vCenter documentation.Networking standards for secure HTTPS connections.
Post your Comments and Discuss Dell D-VXB-DY-A-24 exam with other Community members:
Dane Commented on December 28, 2024 hello there ! can someone confirme that this question are reall quetions and can be a part of exams questions ? thanks a lot. i will take the exams next week but i fell like not ready yet . thanks a lot! GERMANY
Anouar Commented on December 28, 2024 contenu enrichissant Anonymous
Anouar Commented on December 28, 2024 Salut ! Quelqu'un a-t-il tenté cet examen récemment ? Si c'est le cas, veuillez me faire savoir si ces questions sont toujours pertinentes et apparaissent dans l'examen sous le même Anonymous
Tina Commented on December 28, 2024 Looks helpful Anonymous
Our website is free, but we have to fight against bots and content theft. We're sorry for the inconvenience caused by these security measures. You can access the rest of the D-VXB-DY-A-24 content, but please register or login to continue.