Free DES-1121 Exam Braindumps
Specialist - Implementation Engineer PowerMax and VMAX Family Solutions Version 1.0 Questions 21–25 (page: 6)

Updated On: 9-Feb-2026

What would the RDF device and Link states be after an SRDF Update operation?

  1. R1=WD Link=RW. R2=RW
  2. R1=RW Link=NR. R2=RW
  3. R1=WD Link=NR R2=RW
  4. R1=RW Link=RW; R2=WD

Answer(s): D



What is a minimum requirement for Dell EMC VSI 8.0 on a VMAX All Flash array?

  1. Unisphere 8.x
  2. Unisphere 9.x
  3. 5977 1125.1125
  4. 5977.1131.1131

Answer(s): C



DRAG DROP

What is the correct sequence of steps to obtain PowerMax licenses and ensure the PowerMax is configured to allow the licensed features to work properly?

  1. See Explanation section for answer.

Answer(s): A

Explanation:



Refer to the Exhibit.



Which service levels are available for CKD devices'?

  1. Service levels are not used
  2. All service levels
  3. Diamond, Bronze, and Optimized only
  4. Diamond and Platinum only

Answer(s): A



An administrator is managing two PowerMax arrays that are located in two different data centers. The data centers are 550 km apart and are connected by a high bandwidth network link. The administrator wants to replicate data between the two arrays and achieve the lowest RPO

When using SRDF. which mode meets this requirement?

  1. Asynchronous
  2. Adaptive Copy
  3. Metro
  4. Synchronous

Answer(s): C



Viewing page 6 of 15
Viewing questions 26 - 30 out of 120 questions


Post your Comments and Discuss EMC DES-1121 exam prep with other Community members:

AI Tutor AI Tutor 👋 I’m here to help!