Free E20-893 Exam Braindumps (page: 6)

Page 5 of 17

A Dell EMC NetWorker administrator is configuring backups for a new SAP environment What is a purpose of the init.sap file?

  1. Specify the SAP client resources used by the Configuration wizard
  2. Specify the NetWorker backup and recovery parameters
  3. Specify the Oracle parameters used by the nsrsapsv program
  4. Specify the backup interface to use. either RMAN or BACKINT

Answer(s): B



A Dell EMC NetWorker administrator needs to configure a Data Domain system to perform backups using the DD Boost protocol Which actions must be completed on the Data Domain system before configuring NetWorker?

  1. Enable DD Boost, add a DD Boost User, and create a storage unit
  2. Enable NFS, enable DD Boost, and add a Replication license
  3. Enable NFS, enable DD Boost, and create a storage unit
  4. Enable DD Boost, add a DD Boost User, and add a DD Boost license

Answer(s): A



A Dell EMC NetWorker administrator has been performing federated backups of their Microsoft SharePomt farm After a problem with the farm, the administrator needs to perform a full restore.
What should the administrator do before restoring the data?

  1. Re-add the database using the "join-only" option
  2. Unmount any previous SharePoint GLR backups
  3. Install the Agent for Content Transfer Services
  4. Delete the secondary replica databases

Answer(s): B



After experiencing a data loss, a Dell EMC NetWorker administrator needed to recover their Microsoft Exchange server data using the point-in-time recovery method What must be done after this recovery completes?

  1. Full backup of the Exchange server
  2. Reboot the Exchange server
  3. Recover the transaction logs
  4. Commit all transactions since the recovery

Answer(s): A






Post your Comments and Discuss EMC E20-893 exam with other Community members:

E20-893 Discussions & Posts