A backup administrator attempts a hot backup of an Oracle database and receives the following error message: Unable to send CTL message.What is the cause of this issue?
Answer(s): A
These errors can occur when you allocate too many channels for a backup or restore from Avamar Administrator. To resolve this issue, EMC recommends that you set the number of channels to no more than two times the number of processors. If the problem persists after making this change, further reduce the number of channels
https://japan.emc.com/collateral/TechnicalDocument/docu53954.pdf
Refer to the exhibit.A Dell EMC Avamar backup administrator is determining the TCP window size to be used. The WAN link is 100 Mbps.What is the value of the BDP?
Answer(s): B
What is the maximum number of channels supported by Dell EMC Avamar for an Oracle database backup?
Answer(s): D
A Microsoft SharePoint server has been performing backups to a Dell EMC Avamar server. The backup administrator wants to perform a GLR of a document, but is not sure if Dell EMC ItemPoint is installed.What is a characteristic of ItemPoint for SharePoint GLR?
A Dell EMC Avamar backup administrator is tuning the hash cache size to accommodate the backup of a 512 GB database. The database server has 8 GB RAM.To what value should the hashcachemax value be set?
Post your Comments and Discuss EMC E20-895 exam prep with other Community members:
Our website is free, but we have to fight against AI bots and content theft. We're sorry for the inconvenience caused by these security measures. You can access the rest of the E20-895 content, but please register or login to continue.