Free E20-895 Exam Braindumps
Backup Recovery - Avamar Expert Exam for Implementation Engineers Questions 131–135 (page: 28)

Updated On: 10-Feb-2026

An EMC customer is protecting 3000 virtual machines (VMs) with guest level backup. All VMs reside on the same ESX server. The administrators are concerned with the CPU spike during backups since Avamar is trying to initiate as many backups as possible.
What is the best practice for preventing this spike in CPU on the ESX server host?

  1. Use network throttling parameters in the advanced options tab of the dataset
  2. Break the VMs up into multiple groups that run at different times
  3. Use the Backup Priority attribute in the Group settings
  4. Migrate some of the VMs to another ESX host

Answer(s): A



An EMC Avamar customer notices that a client's Progress Bytes and percentage NewBytes are not being reported on the Activity Monitor while a backup is in progress. The backup reports "Completed with Exception(s)" when finished.
What is a possible cause for this issue?

  1. cid.bin file is missing on the backup client
  2. ascd is not running on the Avamar server
  3. avtar.cmd has been deleted on the backup client
  4. Dispatcher table file is missing on the Avamar server

Answer(s): A



A customer has a 1 TB Oracle 10g database on a HP-UX 11.31 client. They have created two groups that run once every 24 hours. One group is for backing up the database; the other group is for backing up the file system. During the course of a week, the customer notices that the client is taking up twice the space as expected.
What is a probable cause?

  1. Client is being backed up twice
  2. DBF files are not excluded in the file system dataset
  3. Group that backs up the database is being run twice a day
  4. Block Change Tracking is not being used

Answer(s): B



A customer wants to maximize their tapeout throughput with Avamar Tapeout (ATO) by using concurrent staging servers. The servers consist of one Microsoft Windows-based and one UNIX- based.
The customer configured environment file #1 with the appropriate staging server variables for each server type involved. Two ATO batch profiles were configured for environment #1 with the appropriate staging server types. The batch jobs were started concurrently.
What is the expected outcome?

  1. Tapeout fails because concurrent tapeout activities are not supported with a single environment file
  2. Tapeout throughput is double that of using a single staging server
  3. Tapeout fails because a single environment file cannot be configured for two staging server types
  4. Tapeout succeeds because two batch profiles can access a single environment file concurrently

Answer(s): A



A customer has a EMC Avamar desktop/laptop environment consisting of 100 clients distributed across three Avamar domains. Compliance requirements mandate that 15 clients with 2 TBs of data on each must have their backups written to tape. Avamar Data Transport (ADT) with three 2 TB transport nodes will be used to accomplish the tapeout process.
Which changes are required to accommodate this environment?

  1. Configure each of the clients in their own dedicated domain
  2. Configure a dedicated transport node per Avamar domain
  3. Configure a dedicated transport node, each containing five of the clients
  4. Configure three domains, each containing five of the clients

Answer(s): A



Viewing page 28 of 53
Viewing questions 136 - 140 out of 259 questions


Post your Comments and Discuss EMC E20-895 exam prep with other Community members:

AI Tutor AI Tutor 👋 I’m here to help!