Free ASM Exam Braindumps (page: 29)

Page 28 of 58

Which of the following Scrum Master's responsibilities are correct?

A) Define the strategic objectives and priorities for projects.
B) Ensure that Scrum processes are correctly followed by all team members including the Product Owner.
C) Ensure transparency and clarity of Prioritized Product Backlog Items.
D) Oversee Release Planning Meeting and schedule other meetings.

  1. В
  2. В, С, and D
  3. В and D
  4. A and В

Answer(s): C


Reference:

http://blog.scrumstudy.com/responsibilities-of-various-scrum-roles-in-an-organization/



On a hydroelectric power project, damage to life and property due to floods and landslides has been identified as a potential risk.
Which of the following Risk Assessment Techniques can be used by the Scrum Team to assess the potential risk, and its impact on project objectives?

  1. Probability Impact Grid.
  2. Probability Trees.
  3. Pareto Analysis.
  4. Expected Monetary Value.

Answer(s): A


Reference:

https://scrumstudy.wordpress.com/2014/08/27/scrum-master-how-are-risks-assessed-in- a-scrumproject/



The Chief Scrum Master is a part of the Scrum Core Team that assembles to retrospect the project and to identify, document, and internalize the lessons learned. There are various tools to Retrospect Project during the Retrospect Project Meeting.
Which of the following tools can be used in this process?

  1. Gap analysis.
  2. SWOT analysis.
  3. Proof of Concept.
  4. Speed Boat.

Answer(s): D


Reference:

http://blog.scrumstudy.com/retrospect-scrum-project-the-lessons-to-be-learnt/



Which of the following is NOT an objective of a Retrospect Sprint Meeting?

  1. Identify Process Improvements.
  2. Identify Feature Improvements.
  3. Identify Best Practices.
  4. Identify Process problems and bottlenecks.

Answer(s): B

Explanation:

:
Primary objectives of Retrospect Sprint meeting are to identify three specific things:
1. Things the team needs to keep doing: best practices
2. Things the team needs to begin doing: process improvements
3. Things the team needs to stop doing: process problems and bottlenecks
4. These areas are discussed and a list of Agreed Actionable Improvements is created.


Reference:

http://blog.scrumstudy.com/all-about-retrospect-sprint-meeting/