GAQM CLSSBB-001 Exam
Certified Lean Six Sigma Black Belt (CLSSBB) (Page 6 )

Updated On: 15-Feb-2026

Which of these items contribute to what is necessary for successful Kaizen events?

  1. Analysis tools
  2. Management support
  3. Operator support
  4. All of these answers are correct

Answer(s): D



Kanban establishes a means of monitoring production, conveyance and delivery information such that efficient flow is established. The method used by Kanban is to require a _____________ before anything moves.

  1. Sign-off
  2. Signal
  3. Bell to ring
  4. Work order

Answer(s): B



When a Belt decides to use written procedures and visual controls to improve the consistency of the tasks that must occur in the process he is improving he has utilized the ___________activity of 5S.

  1. Sustaining
  2. Sorting
  3. Standardizing
  4. Straightening

Answer(s): C



SPC Charts are used extensively in different business and decision-making environments. In this example a vendor is being selected based on speed of delivery. Which of the conclusions would help you pick a vendor for your needs regarding lead-time of delivery from your vendors? (Note: There are 4 correct answers).

  1. Vendor A with a much shorter lead time in delivery
  2. Vendor B as it has a better consistency (lower variance) on lead time
  3. Vendor B as Vendor A shows a situation out of control as shown in red
  4. Vendor B as the Control Limits are much narrower than Vendor A
  5. Vendor B with higher lead time, but a process with much narrower Control Limits

Answer(s): B,C,D,E



Fractional Factorial designs are used to reduce the __________because the number of runs has been lowered.

  1. Time and cost of experiments
  2. Number of people involved
  3. Number of data measurement points
  4. Output summary

Answer(s): A






Post your Comments and Discuss GAQM CLSSBB-001 exam prep with other Community members:

Join the CLSSBB-001 Discussion