GAQM CTIL-001 Exam
Certified Software Tester - Intermediate Level (CSTIL) (Page 2 )

Updated On: 1-Feb-2026
View Related Case Study

Which one is a product risk associated with the air quality management system?

  1. The system required to monitor oxygen levels may be more expensive than those required to monitor air temperatures.
  2. SubsInc may need to recruit extra developers and testers to deliver the project on time.
  3. Oxygen levels may reach dangerously low levels.
  4. Extreme temperatures may lead to heat exhaustion of personnel.

Answer(s): C



View Related Case Study

When creating the functional specification for the temperature control system, which of the following review types would be most recommended to resolve any issues?

  1. A walkthrough.
  2. A technical review.
  3. A management review.
  4. A code inspection.

Answer(s): B



View Related Case Study

Which of the following test design techniques would be most suitable for testing that the oxygen is released at the required times?

  1. Decision Testing.
  2. Statement Testing.
  3. Data flow Testing.
  4. Boundary Value Analysis.

Answer(s): D



View Related Case Study

Which of the following is an accurate depiction of the hierarchy of test management documentation (where the highest comes first)?

  1. Test policy-Test strategy-Project test plan-System test plan
  2. Test strategy-Test policy-Project test plan-System test plan
  3. Test policy-Project test plan-Test strategy-System test plan
  4. Project test plan-Test strategy-System test plan-Test policy

Answer(s): A



View Related Case Study

Which of the following would be an entry criterion into site acceptance testing for the air quality monitoring system?

  1. That the code written to fulfil the requirement to monitor carbon dioxide levels has been 100% path tested.
  2. That the functional specification accurately reflects requirements R1 and R2.
  3. That the system has been tested at levels of oxygen usage well beyond anticipated personnel levels.
  4. That the requirements for temperature control have been signed-off.

Answer(s): C



Viewing page 2 of 6
Viewing questions 6 - 10 out of 25 questions