Free HQT-4180 Exam Braindumps
Hitachi Vantara Qualified Professional - VSP Midrange Family Installation Questions 33–40 (page: 6)

Updated On: 7-Aug-2026

Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.
What should you do next?

  1. Enable Port Security.
  2. Enable Host Group security.
  3. Create a Host Group.
  4. Scan for all WWNs.

Answer(s): C

Explanation:

Technical Justification for Correct Answer: C (Create a Host Group)
To facilitate the connection of multiple servers to a new port on a VSP G700, with the correct topology already set for the port, the next logical step involves ensuring secure and organized access control. Here’s why creating a Host Group (Option C) is the most suitable next step, followed by why other options are less suitable at this stage:
Why Option C (Create a Host Group) is Correct:
Organization and Access Control : Creating a Host Group allows for the logical organization of the servers that will be connected to the new port. This grouping facilitates easier management and security configuration by associating multiple server World Wide Names (WWNs) with the port's access control settings in one step. Efficient Setup for Subsequent Security Measures : Once the Host Group is created, enabling security features (like Port Security or Host Group security) becomes more straightforward, as the target group of servers is already defined.
Why Other Options are Less Suitable as the Next Step:

A: Enable Port Security :
Premature without Definition : Enabling Port Security without first defining which hosts are allowed (via a Host Group) is premature. Port Security is more effective when applied after identifying the authorized access group. Lack of Context for Authorization : Without a Host Group, determining which WWNs to authorize for the port is less streamlined. B. Enable Host Group Security :
Redundant without Existing Host Group : This option implies securing a Host Group that hasn’t been created yet in the context of this scenario. The creation of the Host Group is a prerequisite. Misordered Operation : Security can be enabled after the Host Group is defined, making this step out of sequence. D. Scan for all WWNs :
Inefficient without Context : Scanning for all WWNs without a specific goal (like populating a newly created Host Group) is inefficient and not targeted towards the immediate goal of setting up access for the new port. Post-Group Creation Task : Scanning might be useful after creating a Host Group to ensure all intended servers are included, but it’s not the next logical step after setting the topology. Conclusion:
Creating a Host Group (Option C) is the most appropriate next step as it lays the foundational organization for the servers connecting to the new VSP G700 port, streamlining subsequent security and access configurations.
References:
Hitachi Vantara Documentation - VSP Series Configuration Guide (Refer to sections on Host Group and Security Configurations) Hitachi Vantara Support - VSP G700 Setup and Operation (Explore setup guides and best practices for initial configuration)


Reference:

References:
Hitachi Vantara Documentation - VSP Series Configuration Guide (Refer to sections on Host Group and Security Configurations) Hitachi Vantara Support - VSP G700 Setup and Operation (Explore setup guides and best practices for initial configuration)



Which two specifications may differ between models within the VSP Midrange family? (Choose two.)

  1. number of controllers
  2. number of CPUs and cores per controller
  3. number of drives supported
  4. number of power supplies

Answer(s): B,C



A customer wants to upgrade a VSP E1090 to 1TB RAM capacity.
What is the valid Cache Flash Memory (CFM) configuration?

  1. one BM70 per controller
  2. two BM65 per controller
  3. two BM65 per system
  4. two BM70 per controller

Answer(s): C



In the VSP Midrange family, which module provides power to the Cache Flash Memory (CFM) and to the cache in case of a power outage?

  1. Power Supply Module
  2. Power Module
  3. Backup Module
  4. Cache Module

Answer(s): C



Which three VSP Midrange storage arrays support hardware compression? (Choose three.)

  1. VSP E990
  2. VSP E1090
  3. VSP One B24
  4. VSP One B26
  5. VSP One B28

Answer(s): B,D,E



How many Disk Boards (DKBs) are included in a VSP E1090 system with at least one Drive Box (DB) attached?

  1. 1
  2. 2
  3. 4
  4. 8

Answer(s): C



What are two supported SAS back-end transfer speeds on the VSP Midrange systems? (Choose two.)

  1. 4 Gb/s
  2. 6 Gb/s
  3. 8 Gb/s
  4. 12 Gb/s

Answer(s): B,D



A customer has a VSP E1090 with four attached NVMe drive boxes (DBNs). How many back-end cables are used?

  1. 8
  2. 16
  3. 24
  4. 32

Answer(s): B



Viewing page 6 of 15
Viewing questions 41 - 48 out of 108 questions


Post your Comments and Discuss Hitachi HQT-4180 exam prep with other Community members:

AI Tutor AI Tutor 👋 I’m here to help!