A customer has HPE B-series switches and is not interested in Extended Fabric licenses for edge switches.
They have sites over 10km apart.
Which SAN extension technology should you recommend?

  1. FC over DWDM
  2. FC over CWDM
  3. FCoE
  4. FCIP

Answer(s): D


Reference:

https://h20195.www2.hpe.com/v2/GetPDF.aspx/c04499584.pdf



How does the HPE Nimble Storage product strategy support a customer's investment protection requirements for today and the future?

  1. by supporting replication with arrays from other vendors
  2. by supporting the implementation of third party cache, spinning media, and flash media
  3. by supporting replication between current and previous-generation array models
  4. by supporting the repurposing of obsolete array controllers as high-density servers

Answer(s): B



A customer has a pair of HPE 3PAR arrays with Synchronous Replication enabled. They need recommendations for deploying the Quorum Witness when implementing Peer Persistence.
What should you recommend to the customer?

  1. The Quorum Witness should be in the secondary data center, with IP connectivity to the HPE 3PAR there
  2. The Quorum Witness should be in a third data center, with FC connectivity to both HPE 3PARs
  3. The Quorum Witness should be in the primary data center, with FC connectivity to the HPE 3PAR there
  4. The Quorum Witness should be in a third data center, with IP connectivity to both HPE 3PARs

Answer(s): B


Reference:

https://h20195.www2.hpe.com/v2/GetPDF.aspx/4AA5-8914ENW.pdf



A customer has recently acquired another company that is located less than 3 km from their current main location. Both locations use HPE B-Series products in their storage environment. The customer needs to merge the 2 locations together while still using the current WAN and networking infrastructure at both locations. They need to keep their initial cost down until they are able to redesign both networking infrastructures.
Which protocol should be incorporated when providing a proposal to meet the customer needs?

  1. ISCSI
  2. CWDM
  3. DWDM
  4. FCIP

Answer(s): B