An architect is proposing an HPE Moonshot System, including m710 cartridges, an iLO
Chassis Manager, switch, and uplink modules. The customer needs IT staff to be able to access cartridges over a Remote console.
What should the architect explain to the customer?

  1. IT staff can open a Remote Console to any cartridges linked to an mRCA through the iLO CM.
  2. Remote console access is only supported when a cartridge is part of an HPE Helion CloudSystem solution.
  3. Remote console access is not supported for cartridges; IT staff should use local consoles instead.
  4. IT staff can open a Remote Console to any cartridge through the iLO CM.

Answer(s): A



A software development customers data center has servers from three different vendors.
The customer plans to purchase 15 HPE c7000 enclosures that are populated with BL460c
Gen9 blades. Each enclosure will be deployed with HPE OneView advanced licensing. The customer uses third-party SNMP-based management tools as well as some custom dashboards that were written to monitor the statue of the datacenter.
The infrastructure management team is concerned about how to integrate HPE OneView into its management strategy.
What should the architect demonstrate?

  1. how to access HPE OneView data and incorporate it into the internally developed dashboards using the REST API
  2. how to use HPE OneView as the dashboard for the existing monitoring tools using the REST API
  3. how to point the existing serversto the new HPE OneView instance for all SNMP traps
  4. how to access HPE OneView data and incorporate it into the internally developed dashboards using the iLO RIBCL command language

Answer(s): A



A customer needs a server infrastructure update for its Hadoop HBase solution. The
HBase maximum dataset size will be 120TB.
To host HBase, the architect is planning three HPE Moonshot 1500 chassis that are fully populated with cartridges. The populated chassis provide the following in total:
Which aspect or the design is under provisioned and is likely to cause performance to be degraded to one-tenth or even one-hundredth of its potential?

  1. number of cores per processor
  2. number of processors
  3. amount of local storage on SSDs
  4. amount of RAM

Answer(s): C



An architect reviews an HPE Apollo 6000 design and finds that there are plans for redundant iLO connections on each HPE Apollo 6000 chassis to a pair of top-of-rack switches. These switches are set up as individual switches connected to a single core.
Which configuration change should the architect recommend to ensure a loop free management topology?

  1. Remove one iLO connection from each HPE Apollo 6000 chassis.
  2. Configure MAD between the top-of-rack switches.
  3. Replace the top-of-rack switches with HPE Advanced Power Management Kits.
  4. Configure IRF between the top-of-rack switches.

Answer(s): D