A customer is deploying HPE Apollo Systems, which the customer hopes will help the organization achieve its goals for efficient energy operations. In assessing the customer maturity, the architect finds that IT staff has limited insight into how efficiently servers are operating and limited ability to enforce energy efficiency policies.Which solution should the architect recommend to help solve these issues?
Answer(s): A
A customer has HPE BladeSystem BL460c Gen9 blades with two processors and 512GBof memory. The blades are running a MS-SQL database on a clustered 2TB SAS virtual volume that is exported from an HPE 3PAR StoreServ 8200. The customer reports that theMS-SQL database is performing poorly.After extensive performance trending analysis, it is determined that the database front-endI/O requirements are unpredictable and often exceed 100, 000 IOPs with latency in excess30ms at critical times.Which solution should the architect recommend to resolve the performance issue with consideration to cost and complexity?
Answer(s): B
An architect needs to demonstrate the financial advantages of a proposed HPE server andHypervisor-based solution compared to a legacy server environment that has traditional servers and desktops.Which tool should the architect use?
An architect proposes an HPE Moonshot server solution for a customer. The customer needs a single processor solution with a network switch to allow 10Gb connectivity and support for a software-defined network solution.Which HPE Moonshot switch module meets the customers needs?
Answer(s): C
View the Exhibit.Refer to the exhibit. An architect is planning an HPE Moonshot System with m710 cartridges to support a customer application virtualization solution. The customer indicated that the maximum acceptable response time for the solution is three seconds. The architect has implemented a POC and tested a single cartridge with different numbers of user sessions.The architect monitored resource utilization throughout the tests. The results of the test with the point at which the response time exceeded three seconds are shown, marked as the "VSI max."What should the architect conclude from this test?