Free HPE6-A80 Exam Braindumps (page: 5)

Page 4 of 16

DRAG DROP (Drag and Drop is not supported)
Match each hospital room with a potential issue for the AP design (Each match will be used once.)

  1. See Explanation section for answer.

Answer(s): A

Explanation:



in which scenario do Aruba CX 6400 Series switches, but not Aruba 6300M Series switches, meet the needs Tor a wired upgrade?

  1. The customer requires switches in the same closet to operate together as a single switch for Link Aggregation but to be managed as separate devices.
  2. The customer requires enhanced redundancy at the access layer and wants to ensure that each switch can continue to operate even if a power supply fails
  3. The customer requires each access layer switch to support at least 25Gbps on its fiber uplinks at all times; including if up to one uplink tails.
  4. The customer has recently deployed Aruba AP-535 APs and is concerned about a future-proof wired edge that will continue to support expanding bandwidth requirements.

Answer(s): A



Compare the scenarios below. For which scenario do AP-575S meet the needs?

  1. The customer needs APs for an Indoor nigh density environment In which tne customer prefers dual 5GHz operation.
  2. The customer needs APs for an indoor stadium that requires overhead coverage and directional antennas.
  3. The customer needs to mount APs in an outdoor area, but that area only has fiber cable available,
  4. The customer needs APS mounted to a concrete building exterior to provide coverage in a 90 foot (27m) radius from the building.

Answer(s): C



Refer to the exhibit.

A customer has these availability requirements:
• loss of one controller with stateful failover and without impact on wireless client connectivity
• loss of one core switch without loss of connectivity for any endpoints or APs in the building
• loss of any one switch-lo-switch or MC-to-switch link without loss of connectivity for any endpoints or APS in the
building and with minimal impact on infrastructure functionality
• loss of any one access switch with minimal impact to wireless client connectivity

The exhibit shows the current plan for the topology.
Which change should the architect make to the plan to provide better support for the customers availability requirements?

  1. Add VLANs 11 and 15 to the MC connections to ensure both MCS can manage any of the APS.
  2. Add 120 additional AP licenses, so that each MC can support ail the APs, even if the other MC fails.
  3. Use two 40GBE DACs between the core V3X switches for their switch links.
  4. Change the 40GbE DAC on the 8400 switch to a stacking cable with stacking module.

Answer(s): B






Post your Comments and Discuss HP HPE6-A80 exam with other Community members:

HPE6-A80 Exam Discussions & Posts