4G antenna of ECC800 should be connected to ( ).
Answer(s): B
NetEco can mail reports to customers.
Answer(s): A
(___________________) is the signal processing and centralized management module of UPS5000-E
When installing the power line on the UPS5000-E, if there are different sources on the main-lines and bypass, you need to remove the copper bars connected to the bypass and main lines first, and then connect the main circuit and bypass input respectively.