If the customer load cannot be power-off, what should be taken care when closing the maintenance bypass switch?

  1. The maintenance bypass switch can also be closed in the inverter power supply mode
  2. Turn off the inverter, let the UPS be in bypass power supply mode and then close the maintenance bypass switch
  3. First perform EPO then close maintenance switch
  4. Close the maintenance switch first and then execute the EP

Answer(s): A,B,D



Which is not included in the routine maintenance of the ECC800 module?

  1. Check whether the power indicator is normal
  2. Check the fans for the ECC800 module
  3. Check whether the power cable is properly connected
  4. Create a micro-module view

Answer(s): D



The ATS/MCCB input unit of an integrated UPS is used to ( ).

  1. Provide the branch output of the mains supply
  2. Provide dual or single input for cabinets.
  3. Provide the branch output of the UPS supply
  4. Monitor the running status.

Answer(s): B



Two UPS2000-G with different software version can be connected in parallel.

  1. TRUE
  2. FALSE

Answer(s): B



The report functions of NetEco has a variety of presentation forms, including visualization of bar charts, pie charts, graphs, etc.

  1. TRUE
  2. FALSE

Answer(s): A