For NetCol5000-A installation, the required time of preserving positive pressure is ( ) hours.
Answer(s): C
A certain distance should be reserved at the rear and top of the UPS5000-E, ensuring ventilation and heat dissipation.
Answer(s): A
First time powering on UPS5000-E, make sure that the load switch is OFF
The battery discharge time of UPS2000-G-(6-20kVA) is far less than the design time. The possible cause is that (___________________).
Answer(s): A,B,C
If IP21 components is configured, the top air outlet kits can also be installed on the UPS5000-E.
Answer(s): B
IP21 is not supported in UPS5000-E.