The compressors selected by Huawei's 25kW half-cabinet inverter air-cooled row-level air conditioners are first-class brands in the industry, which are:

  1. Copeland
  2. Danfoss
  3. EBM
  4. DAIKIN

Answer(s): C



How far can the FusionModule1000A V2R3 IT cabinet slide in both directions?

  1. 100mm
  2. 150mm
  3. 200mm
  4. 220mm

Answer(s): C



Relevant standards stipulate that the voltage drop of the AC cable needs to be controlled within 3%, and it is recommended that the voltage drop of the AC power edge be controlled within ( ) when designing the UPS system. /

  1. 0.01
  2. 0.02
  3. 0.03
  4. 0.05

Answer(s): A



What does the DN in DN50 mean?

  1. The inner diameter of the tube
  2. The outer diameter of the tube
  3. Nominal Radius of Tube
  4. Nominal diameter of pipe

Answer(s): D



In a project, the customer wants to show the operation and maintenance of the data center to the external visiting customers. At this time, can the () function of the NetEco management system be used to achieve this?

  1. Alarm management
  2. Energy Efficiency Management
  3. Large screen display
  4. Report Management

Answer(s): C