In a project, the customer wants to show the operation and maintenance of the data center to the external visiting customers. At this time, can the () function of the NetEco management system be used to achieve this?

  1. Alarm management
  2. Energy Efficiency Management
  3. Large screen display
  4. Report Management

Answer(s): C



The NetEco6000 management system can manage the devices inside the FusionModule and outside the module at the same time. In the default recommended solution, the devices inside the FusionModule use the ( ) collector to access the device, and the devices outside the module use the ( ) collector. to access the device?

  1. ECC500, ECC500
  2. ECC500, ECC800
  3. ECC800, ECC500
  4. ECC800, ECC800

Answer(s): C



UPS2000-G 6~20kVA maximum support () parallel, good scalability.

  1. 0
  2. 2
  3. 3
  4. 4

Answer(s): D



NetCol5000-A042H Full-cabinet row-level air-cooled inverter precision air conditioner can match the outdoor unit model and adaptable temperature range: ()/

  1. NetCol500-A026 (-20~45 )
  2. NetCol500-A036 (-40~45 need to bring low temperature components)
  3. NetCol500-A072 (-5~55 )
  4. NetCol500-A088 (-5-55 )

Answer(s): C