What is the maximum IT load supported by the FusionModule2000 integrated UPS?

  1. 50kW
  2. 125kW
  3. 150kW
  4. 75kW

Answer(s): B



What is the maximum IT load supported by the FusionModule2000 integrated UPS? ( )

  1. 125KW
  2. 150KW
  3. 75KW
  4. 50KW

Answer(s): A



What kind of incoming and outgoing lines can be realized by the FusionModule2000 integrated power distribution cabinet?

  1. Under the line and under the line
  2. Up in and out on the line
  3. Top-in and bottom-out lines
  4. Down in and out on the line

Answer(s): B



FusionModule solution can use ECC800 to realize local monitoring, and use NetEco management system to realize centralized monitoring of multiple micro-modules. Then, in the project bidding quotation, which product is the configuration quotation of the ECC800 collector in?

  1. NetEco Management System
  2. FusionModule Solution
  3. UPS Products
  4. None of the above is true

Answer(s): A



The NetEco6000 management system supports access to third-party equipment to achieve centralized management of the computer room; then, when monitoring which of the following equipment is connected to third-party equipment,
it is necessary to pay the RM bill and report the third-party equipment access fee? (

  1. Huawei UPS 5000E
  2. Huawei Power Supply TP48300
  3. Emerson Air Conditioning
  4. None of the above is true

Answer(s): C