If the customer has high requirements on the availability of the management system and requires that the normal use of the system is not affected by a single point of failure of the hardware, the NetEco management system can provide a high-availability solution of dual-system backup.
What are the hardware resources required by NetEco in the dual-computer solution? (

  1. 2 servers + 1 disk array + 1 switch
  2. 2 servers + 2 disk arrays + 3 switches
  3. 1 server + 1 t-disk array + 2 switches
  4. None of the above is true

Answer(s): B



Using UPS5000-E (50kVA power module), the actual load is 160kW, the rack 1+1 redundancy, the single-machine backup power scheme is adopted, the backup power scheme for each machine, each rack has 3
sets of batteries, each set of 40 cells, The main switch box capacity is (

  1. 630A
  2. 500A
  3. 250A
  4. 320A

Answer(s): A



Using UPS5000-E (50kVA power module), the actual load is 160kW, the rack 1+1 redundancy, the single-machine backup power scheme is adopted, each rack has 3 groups of batteries, each group is 30, and the capacity of the main switch box is ( )

  1. 250A
  2. 320A
  3. 500A
  4. 630A

Answer(s): D



When the distance between the outdoor unit and the seaside is 0.5km~3.7km, you need to configure the () outdoor unit

  1. Class d
  2. Class a
  3. class c
  4. class b

Answer(s): C



When the distance between the outdoor unit and the seaside is 0.5km~3.7km, you need to configure the () outdoor unit

  1. Class d
  2. Class a
  3. class c
  4. class b

Answer(s): C