Where is the UPS of Chongqing Airport used?

  1. Lighting run-up
  2. Terminal
  3. Other

Answer(s): B



The NetEco management system can support deployment on () virtual machine software, and save the procurement of servers through virtualized deployment?

  1. MS Hyper-V
  2. VMware
  3. KVM
  4. Parallels

Answer(s): B



What is the maximum power of the IT cabinet of FusionModule500&FusionModule800?

  1. 3KVA
  2. 5KVA
  3. 7KVA
  4. 9KVA

Answer(s): C



Does the FusionModule800 channel have a skylight?

  1. have
  2. None

Answer(s): B



When a system is configured with 1H battery backup time, the discharge termination voltage of the battery cell should be selected as ( ).

  1. 1.60V
  2. 1.67V
  3. 1.75V
  4. 1.80V

Answer(s): C