Free C1000-116 Exam Braindumps (page: 2)

Page 1 of 17

Which statement is true about working with Business Automation Navigator Container?

  1. Unlike the traditional Navigator, the Container Navigator cannot be connected to a Business Automation Workflow server.
  2. Container based Business Automation Navigator provides limited security capabilities.
  3. Container based Business Automation Navigators are packaged by default with the Container based Business Automation Workflow.
  4. Container based Business Automation Navigators can connect to Business Automation Workflow when using the same LDAP.

Answer(s): D



Which option should a developer use to ensure a message event with an attached UCA will trigger even if the message event is not yet reached?

  1. Repeatable
  2. Interrupt
  3. Consume Message
  4. Durable Subscription

Answer(s): D



When creatinq a new Role in the roles tab of Case desiqner, what action need to take place to unify the experience of the users also involved in BPMN workflows?

  1. Roles and teams are two distinct concepts, the same users must be put in Roles and Teams for the behavior to be unified.
  2. A corresponding Group must be created in LDAP that can be used by manually creating a team in the Process Designer application.
  3. A corresponding Team and Group will be automatically created in the local application visible in Process Designer, this Team should then be used in the BPMN flows.
  4. Using the same name for the Role as an existing team in Process designer will automatically map the two entities.

Answer(s): D



Which is a good design practice for Business Automation Workflow?

  1. Turn off auto tracking whenever possible.
  2. Accessing the product tables using SQL such as "LSW Task" is encouraged within the Process App since it performs better than the API's.
  3. Business objects bound to a coach can be large as long as the number of elements on the coach stay below 40 fields.
    D- Since the process variables are not frequently updated, it is fine to have large business objects on the Process variables level.

Answer(s): B






Post your Comments and Discuss IBM C1000-116 exam with other Community members:

C1000-116 Discussions & Posts