Free C2010-530 Exam Braindumps (page: 3)

Page 2 of 19

A company's users are seeing slow performance when opening the Work Order Tracking application. After some investigation it is determined that the default query is doing a full table scan.
How can this be prevented?

  1. Verify default table indexes exist.
  2. Verify columns in the SQL statement WHERE clause are not indexed.
  3. Verify no leading wildcard character in the SQL statement WHERE clause.
  4. Verify the Maximo user executing the SQL statement has query rights to the table.

Answer(s): A



A Maximo database administrator has imported too many database connections being idle and eventually causing the database to run out of connection resources. The administrator wants to detect and release stale database connections.
Which set of properties must be configured?

  1. mxe.db.url, mxe.db.user, mxe.db.password
  2. mxe.mbocount, mxe.db.logSQLTimeLimit, mxe.db.fetchResurltLogLimit
  3. mxe.db.closelongruncoon, mxe.db.longruntimelimit, mxe.db.detectlongrunconninterval
  4. mxe.db.initialConnections, mxe.db.minFreeConnections, mxe.db.maxFreeConnections

Answer(s): A



A company requires a message notification from within the Workflow Process when an owner has not been specified on a Service Request.
Which workflow node would provide that capability without scripting or custom code?

  1. Stop Node
  2. Condition Node
  3. Interaction Node
  4. Manual Input Node

Answer(s): A



A company wants a weekly email notification sent to the assigned owner of the Work Order when the status of the Work Order is in a Waiting Material status.
What must be accomplished on the escalation point to meet this requirement?

  1. Identify the calendar the escalation will use and set the repeat checkbox to active.
  2. Identify the time end/or condition based criteria, and set the frequency checkbox to active.
  3. Identify the calendar the escalation will use, identify the time and/or condition based criteria, and set the repeat checkbox to active.
  4. Identify the time and/or condition based criteria, set the elapsed time interval to 1, set the elapsed time unit of measure to weeks, and set the repeat checkbox to active.

Answer(s): C






Post your Comments and Discuss IBM C2010-530 exam with other Community members:

C2010-530 Discussions & Posts