Free C2010-555 Exam Braindumps (page: 11)

Page 10 of 37

An administrator has a requirement to update the address of all company records associated with a certain vendor.
How can this be achieved?

  1. Update the company set with the new address.
  2. Update the vendor record and select Update Related Vendors?.
  3. Update the company template and check the checkbox Roll Down?.
  4. Update the company master record and check the checkbox Update Related Companies?.

Answer(s): D



A company wants to trigger a PM based on a characteristic type meter.
How can this be accomplished?

  1. Create a master PM and link to the characteristic on the Related Records tab.
  2. Create a condition monitoring point and specify the PM on the upper or lower limit.
  3. Create a PM against the asset and specify the meter on the Frequency tab of the PM.
  4. Create an escalation based on the characteristic meter and trigger the PM via an action.

Answer(s): B



A store manager needs to make changes to an asset via the Move/Modify action. Which of the following changes can be made? (Choose two.)

  1. Features
  2. Storeroom
  3. Asset's location
  4. Class description
  5. Parent/child relationship

Answer(s): C,D



A company is using Process Flow Control and wants to change the default values for Flow Start and Flow Complete statuses.
Where can these values be configured?

  1. System Properties
  2. Work Type settings
  3. WOSTATUS Domain
  4. Change Work Order Options action

Answer(s): B






Post your Comments and Discuss IBM C2010-555 exam with other Community members:

C2010-555 Discussions & Posts