Free C9510-820 Exam Braindumps (page: 4)

Page 3 of 18
C. defect
D. epic

Answer(s): C, D
QUESTION: 10
What are the distinct types of dashboards?

A. Project, Team, Personal, and Mini
B. Web, Eclipse, Workbench, and Visual Studio
C. Lifecycle, Ful , Partial, and Mini
D. Public, Private, Semi-private, and Shared

Answer(s): A
QUESTION: 11
What is the repository workspace?

A. a server-side entity that tracks items that have been placed under source control
B. a local workspace that holds a copy of specific sets of file versions that are stored in Rational
Team Concert
C. the Eclipse workspace used when Rational Team Concert is launched by using the Eclipse
client
D. the local copy of the latest file versions on a Rational Team Concert stream

Answer(s): A
QUESTION: 12
Which basic report output styles are produced by the reporting capabilities available with
Rational Team Concert?

A. tables, models, and icons
B. diagrams, sketches, and free-form text
C. graphs, charts, and documents
D. boiler-plates, pivot tables, and references

Answer(s): C
QUESTION: 13
Which three work item types appear by default in the Scrum template? (Choose three.)

A. epic
B. milestone
C. defect
D. retrospective
E. sprint



Post your Comments and Discuss IBM C9510-820 exam with other Community members: