Which is not the fundamental test process?

  1. Planning and control
  2. Test closure activities
  3. Analysis and design
  4. None

Answer(s): D



Which list of levels of tester independence is in the correct order, starting with the most independent first?

  1. Tests designed by the author; tests designed by another member of the development team; tests designed by someone from a different company.
  2. Tests designed by someone from a different department within the company; tests designed by the author; tests designed by someone from a different company.
  3. Tests designed by someone from a different company; tests designed by someone from a different department within the company; tests designed by another member of the development team.
  4. Tests designed by someone from a different department within the company; tests designed by someone from a different company; tests designed by the author.

Answer(s): C

Explanation:

This option has someone nearer to the written code in each statement. All other options are not in this order.



Which of the following statements are true?

(i) For every development activity there is a corresponding testing activity.
(ii) Each test level has the same test objectives.
(iii) The analysis and design of tests for a given test level should begin after the corresponding development activity.
(iv)Testers should be involved in reviewing documents as soon as drafts are available in the development life cycle.

  1. (i) and (ii)
  2. (iii) and (iv)
  3. (ii) and (iii)
  4. (i) and (iv)

Answer(s): D

Explanation:

Option (ii) is incorrect: each test level has a different objective.
Option (iii) is also incorrect: test analysis and design should start once the documentation has been completed.



Which of the following is true about the V-model?

  1. It has the same steps as the waterfall model for software development.
  2. It is referred to as a cyclical model for software development.
  3. It enables the production of a working version of the system as early as possible.
  4. It enables test planning to start as early as possible.

Answer(s): D