Free ISTQB-ADVANCED-LEV1 Exam Braindumps
Pass your ISTQB Advanced Level Test manager Exam exam with these free Actual Questions and Answers
Exam Code:
ISTQB-ADVANCED-LEV1
Exam Title:
ISTQB Advanced Level Test manager Exam
Exam Provider:
ISTQB®
Exam Questions:
80
Updated On:
16-Jun-2025
7452
7452 students passed the ISTQB-ADVANCED-LEV1 Exam
91.1%
Average score for the ISTQB-ADVANCED-LEV1 Exam
80
Questions and Answers in this ISTQB-ADVANCED-LEV1 Exam
92% of students found these exam questions nearly identical to real exam.
QUESTION:
1
According to ISTQB syl abus, systems of systems;
I). Contain interconnected hardware, software applications and communications.
II). Include big bang merging of independent collaborating systems to avoid creating the entire
system from scratch.
III). Can be less reliable than individual systems
IV). Characteristics include; long duration of projects, version management and regression tests
at systems of systems level.
A. I, II and IV are true.
B. I, II are true and III is false.
C. I, III, and IV are true, II is false.
D. II,III and IV are true, I is false.
Answer(s):
C
QUESTION:
2
Select the correct statement;
A. Testing processes are interconnected and related to activities like requirements engineering,
software development, etc.
B. Testing tasks cannot be concurrent.
C. Requirements engineering and software testing are two isolated activities.
D. Testing activities / processes do not have to be aligned to the chosen software development
lifecycle model.
Answer(s):
A
QUESTION:
3
Which of the following statements are false?
I). Test execution starts when the system entry criteria are met (or waived) and test execution
ends when exit criteria are met.
II). System test environment creation might start during system design in V-model
III). Long term prospects needs to be considered when selecting test process or tools.
IV). Daily/weekly scrum meetings are part of agile testing method.
A. I and II and false.
B. II, III and IV are false
C. I, II, III are false
D. None of them are false
Answer(s):
D
QUESTION:
4
System test closure activities occur;
2